BACKGROUND

St Andrew’s Church is a Category A listed building, constructed on Fort William High Street in 1880. The church is set within a churchyard that also accommodates the twentieth-century rectory and church hall. The north-west corner was previously developed to provide retail premises, leased from the church and providing an important source of income.

Although the church has a much- reduced congregation, it remains an important community and visitor asset, attracting more than 28,000 visits each year. The building fabric requires significant repair and refurbishment, particularly to the roof and stonework, alongside improvements to its facilities and accessibility.

OUTCOME

D3A was appointed to undertake a feasibility study to identify opportunities to improve the visitor offer and create a welcoming, accessible and fit-for- purpose church and hall. The study considered how the buildings could support a range of community activities while remaining practical to manage, financially sustainable and appropriate to their historic significance.

The feasibility study includes an assessment of the condition of the buildings and their building services, with recommendations for addressing existing issues, in particular the leaking roof. Its objectives are to address the required building repairs, reduce running costs and carbon footprint, improve sustainability and access, and attract additional users, including possible anchor tenants, and activities to the church and hall.

A café facility is regarded as central to improving the church as a visitor attraction. Options include a covered area attached to the retail unit, featuring a translucent photovoltaic canopy that would also generate electricity on site character of the listed building.

In the future, the retail unit offers further potential to provide facilities for visitors and for community and educational uses, without impacting on the church itself.

The study also considers sympathetic alterations to the layout of the church to improve access for all users, provide a greater range of internal uses and deliver modern, unisex welfare facilities, alongside an enhanced visitor attraction at the church and grounds, including café facilities and external illumination to increase footfall and income.

The study reflects the vision and aspirations of Fort William 2040, aiming to bring enhancements to the town’s attractions and facilities while supporting the guiding principle of addressing the climate and ecological emergency and working towards a net zero town. 

Alongside the feasibility study, d3associates prepared Energy Audits and Decarbonisation Plans for both buildings. Site surveys informed a programme of energy efficiency measures, prioritising interventions appropriate to the listed buildings and offering a cost-effective route to reducing energy consumption and carbon emissions.

Recommended measures included increasing insulation within the hall roof void, secondary glazing to the church’s stained-glass leaded windows and targeted draught-proofing.

A range of low-carbon heating options was assessed to replace the hall’s night- storage heaters and the church’s diesel boiler. For the hall, air-to-air heat pumps were identified as the most appropriate solution, reflecting its intermittent use.

For the church, which is heated daily because it remains open to visitors,a techno-economic assessment compared infrared heating, a high- temperature heat pump and a hybrid solution combining infrared heating for services with an air-to-water heat pump providing background heating. The hybrid solution offered the lowest capital cost and lowest annual energy costs, making it the preferred option.

Several solar PV and battery storage options were also assessed. The preferred solution is an integrated PV system on the south-facing church roof. With the existing slates approaching the end of their design life, integrating PV with future roof renewal provides a cost-effective opportunity to reduce replacement slates while minimising visual impact on this important listed building.

Together, the feasibility study and decarbonisation work provide St Andrew’s Church with a coordinated and deliverable pathway to repair and reimagine its buildings, reduce energy consumption, operating costs and carbon emissions, and secure its future as a welcoming, accessible and financially sustainable community and visitor asset.